21M Supreme Power Corporation P1
Posted On: 25 May, 2022
Client: Supreme Power Corporation
Project Title: Engineering, Procurement, Fabrication, Construction of Tank Farm Canal, Bundwall, Individual Tank Canal, Oil Water Separators and Flooring, Installation, Testing and Commissioning of Heavy and Light Fuel Oil Storage, Buffer, Day, and Leak Tanks, Lube Oil Storage and Service Tanks, High and Low Temperature (HT & LT) Cooling Water Expansion Tanks, Maintenance Water Tank, Raw, and Treated Water Tanks, Sludge Tank, and Oily Water Buffer Tank for 11MW Diesel Power Plant.
Location: Mati City, Davao Oriental
Amount: Php 21,841,181.82
Comments (0)
Post Your Comment